HPC Infrastructure Deployment — Turnkey Cluster Delivery
Turnkey HPC infrastructure deployment: hardware supply, rack installation, network configuration, software stack and go-live. For universities, research centres and enterprise IT.
HPC infrastructure deployment means running every stage — from design decisions through physical installation and software configuration to user handover — with a specialist team. Mevasis delivers enterprise HPC projects for customers ranging from universities and pharmaceutical companies to defence organisations and the finance sector.
Deployment Methodology
Phase 1: Design and Procurement (6–14 weeks)
Technical design:
- Workload analysis and sizing
- Node type and count
- Network topology (InfiniBand fat-tree, Ethernet)
- Storage architecture
- Power and cooling calculation
Procurement:
- Hardware ordered from approved suppliers
- Delivery tracking and logistics coordination
- Pre-acceptance testing at the factory
Phase 2: Physical Installation (1–2 weeks)
- Rack layout plan (1U/2U node placement, switch position)
- Cable management (Ethernet, InfiniBand, power)
- PDU installation and power balancing
- Out-of-band (OOB) management network
- Cooling airflow optimisation
Phase 3: Software Stack (2–3 weeks)
1. Operating system (Rocky Linux 9)
- PXE boot infrastructure
- Warewulf 4 cluster provisioning
- Node image creation and distribution
2. Network configuration
- InfiniBand subnet manager (OpenSM)
- IP addressing (management, compute, storage)
- DNS and NTP
3. Job scheduler
- SLURM installation and configuration
- MUNGE authentication
- Accounting database (slurmdbd)
- Partition and QOS definitions
4. Software environment
- Lmod module system
- Compilers (GCC, Intel oneAPI)
- MPI libraries
- CUDA + cuDNN (for GPU nodes)
5. Monitoring
- Prometheus + Grafana
- DCGM Exporter
- Alertmanager
Phase 4: Testing and Acceptance (1–2 weeks)
- HPL (Linpack) benchmark: targeting 75%+ efficiency against theoretical peak
- IOR storage benchmark: I/O throughput verification
- OSU MPI benchmark: latency and bandwidth measurement
- GPU benchmark: nvidia-smi and DCGM health checks
- User acceptance testing: validation against real workloads
Phase 5: Handover and Training
- System administrator training (2 days)
- User training (SLURM, Lmod, best practice)
- Documentation handover
- Start of 90-day warranty support
To get a quote for HPC infrastructure deployment, get in touch.
Hardware Catalogue
You can review the network hardware we deploy in our HPC networking catalogue and request a quote for a part list matched to your requirement.
Frequently Asked Questions
Hardware supply runs 6–14 weeks, physical installation 1–2 weeks, and software configuration and testing 2–3 weeks — 9–19 weeks in total.
Technical support under warranty is included for 90 days after handover. Ongoing maintenance can be arranged through an HPC managed service contract.
We assess existing hardware. Compatible components can be integrated; equipment that underperforms or does not fit is reported.
Related Solutions
Let's Build Future Together.
