On-Site HPC — On-Premises High Performance Computing Infrastructure
On-premises HPC infrastructure installed in your own data centre or server room. Data sovereignty, KVKK compliance and full control.
On-premises HPC brings high performance computing capacity into your own facility. It is the preferred model for organisations that need data sovereignty, low latency and full control.
Why On-Premises
Data Sovereignty and KVKK Compliance
Your data never leaves your organisation’s physical boundary. For organisations in healthcare, defence, banking and the public sector this is often a hard requirement. Assessments can be made against KVKK, BDDK and sector-specific regulation.
Low Latency
Compute and data source sit on the same physical network — a decisive advantage for workloads that move large volumes of data, such as genomics, CFD and manufacturing simulation.
Full Technical Control
Hardware configuration, network topology, user management and workload policy stay entirely under your control, allowing customisation that shared cloud infrastructure cannot offer.
Long-Term Cost Efficiency
Over a five-year-plus horizon, owning on-site hardware delivers a lower total cost of ownership than equivalent cloud capacity.
How the Mevasis On-Site Service Runs
1. Requirements Analysis and Feasibility
- Workload profile (MPI, GPU, data-intensive, mixed)
- User count and concurrent job estimate
- Assessment of existing facilities (power, cooling, network)
- Budget and TCO analysis
2. Architecture Design
- Node type and count
- Network topology (InfiniBand, Ethernet)
- Storage system (BeeGFS, NFS, Lustre)
- Job scheduler selection (SLURM, PBS)
3. Procurement and Installation
- Hardware sourced from approved suppliers
- Physical installation (rack, cabling, power)
- Operating system and cluster management software
- Network configuration and high availability
4. Software Stack Configuration
Rocky Linux 9 / AlmaLinux 9
Warewulf 4 (node provisioning)
SLURM (job scheduler + accounting)
Lmod (module management)
OpenMPI + MVAPICH2 + Intel MPI
CUDA + cuDNN (for GPU nodes)
Prometheus + Grafana (monitoring)
5. Testing and Acceptance
- HPL (Linpack) and GPU benchmark tests
- User acceptance testing
- Performance reporting
6. Handover and Training
- System administrator training
- User documentation
- Optional managed operations
Reference Configuration
An example mid-sized production environment with 32 compute nodes:
| Component | Configuration |
|---|---|
| Login node | 2× (HA) — AMD EPYC 9354, 256 GB RAM |
| Compute node | 32× AMD EPYC 9654 (96-core), 512 GB RAM |
| GPU node | 4× (optional) — 4× NVIDIA L40S |
| Storage | BeeGFS, tiered NVMe+SAS, 200 TB |
| Network | InfiniBand HDR200 fat-tree |
| Scheduler | SLURM + Munge auth |
For sizing specific to your organisation, request a quote.
Frequently Asked Questions
Hardware supply runs 6–14 weeks, with physical installation and software configuration taking 2–4 weeks — 8–18 weeks in total.
We assess power capacity, cooling infrastructure and rack space. Where the room falls short we provide an assessment report and remediation recommendations.
Our managed HPC operations service covers remote monitoring, software updates and on-site response.